Results About Careers Contact Law Enforcement Video Request
Virtual Client Sign-in Guard Client Sign-in Request a Free Security Assessment (519) 800-3947
An ACS camera cluster on a mast overlooking an active road construction site, excavator and roller working behind it
Construction Security

Construction security
that moves with the build.

Guards on the gate, towers over the perimeter, and ACS operators watching live once the crews go home. Coverage gets repositioned as the site changes shape, from excavation to handover.

What the numbers say

Plant, copper and fuel
are what actually leave.

Nobody counts construction theft nationally in Canada. What is published — copper off the network, offences on American sites, fire damage after midnight — all points the same way.

Ontario · 2026

0first half of 2026

copper theft and vandalism incidents on Bell's Ontario network in six months — 58% of a national total that rose 78% year over year.

Bell · reported August 2026

United States

0construction sites · 2025

offences recorded on U.S. construction sites in 2025 by NIBRS-reporting agencies — 29,316 thefts, 10,466 break-ins and 1,692 vehicle thefts among them.

FBI · NIBRS table 18

45%of fire damage

of direct property damage in U.S. under-construction fires came from fires set on purpose — fewer than one in ten of the fires. Just over half of all the damage came between midnight and 6 a.m.

NFPA · fires 2017–2021

Copper: Daily Commercial News, 14 August 2026, reporting Bell's count of incidents on its own network — not a count of construction-site theft, which no Canadian body publishes. U.S. site offences from the FBI's NIBRS table 18 (2025, released August 2026), counting what participating agencies recorded. Fire figures from NFPA, Fires in Structures Under Construction (October 2023), U.S. fires 2017–2021; there is no Canadian equivalent.

How it works

One tower, moved as
the footprint moves.

Excavation, frame, floors, close-in: the loss moves every few weeks, and the coverage moves with it. This is one build the way ACS positions for it, phase by phase.

A road construction site at night marked for monitoring: the monitored area washed in gold, the tower traced in red, and crossline detection drawn across both roads

The site as it is actually marked for monitoring — the monitored area, crossline detection on both ways in, and the camera cluster at the head of the mast.

  1. Monitored area Region entry · armed after hours

    The washed ground is the zone — the machines, the materials and the ground they stand on. A person entering it after hours is spoken to live over the tower.

  2. Crossline detection Both directions · person + vehicle

    A line across each way in. Crossing it after hours starts the sequence — verify, speak, escalate — while whoever crossed is still on open ground.

  3. Camera cluster 25-ft mast · pan-tilt-zoom + fixed heads

    The red trace is the unit; the pulse is the camera cluster at the top of its mast. It stands inside the area it watches, so anyone reaching for it has already been seen.

A site that changes shape every month

The thief knows what phase
you are in. So should your coverage.

What is worth stealing on a build changes four times before handover, and it never changes back. Coverage that was right at excavation is pointed at empty ground by drywall.

  1. An aerial view of an ACS tower over a road construction site during earthworks
    Phase 01 · Site prep and excavation

    Nothing is built yet. Everything is driveable.

    On a site with no building on it, the machines are the site. They sit in the open with the keys in a box, and a tracked excavator is on a trailer and gone in the time it takes to back up to it — at an hour when a low-loader on the road looks like work.

    • Tower at the haul road, covering the way out
    • Plant compound armed as the last crew leaves
  2. The frame of a building under construction with a crane above it
    Phase 02 · Structure

    The frame goes up, and so does the scrap value.

    Steel, forms, scaffold and lifting gear are sold by weight and cut down before they are sold. Once it is in the back of a truck there is nothing left on it that says it came from your site, which is why almost none of it is ever recovered.

    • Coverage repositioned as the footprint grows
    • Gate control while trades are on site
  3. Two workers on scaffolding installing glazing into the face of a building
    Phase 03 · Envelope

    The month the building can hide someone.

    Glazing, membrane and roofing copper all land inside a few weeks — and the building is now closed enough that a person inside it cannot be seen from the fence line. A perimeter camera is watching the wrong thing from here on.

    • Cameras moved onto the elevations
    • Openings watched, not just the perimeter
  4. An empty commercial room at fit-out stage with the ceiling open and services run
    Phase 04 · Fit-out and handover

    The value is indoors now, and it is all on a lead time.

    Appliances, mechanical plant, wire and tools. At this stage the loss is not the price of what went missing — it is the handover date, because every one of those items is ordered weeks ahead and the schedule has no float left in it.

    • Interior coverage and access control
    • Officer on the gate at trade peak

More than half of the fire damage on U.S. builds happens between midnight and 6 a.m.

NFPA · Fires in Structures Under Construction · U.S. fires 2017–2021 · figures above
What you get

What we put on site,
and what each part stops.

A site changes shape every few weeks, and so does where the loss comes from. Here is what ACS puts where, and what each position is there to stop.

An ACS officer on foot outside a building At the gate, from day one

Security Guard Services

A licensed officer on the gate for deliveries, trades and sign-in, through the hours the site is open and the ones it is not.

An ACS mobile tower being towed to a site Over the perimeter

Mobile Defense Towers

A 25-ft mast on solar with its own connection, so coverage starts before the power does and relocates as the build moves across the site.

A thermal camera frame from an ACS site: a person at a fence, tracked and outlined After the crews leave

Virtual Security Guard

An operator checks what the detection flags and speaks to whoever is on the site, over the tower.

An ACS patrol vehicle on a property Between the towers

Mobile Patrol & Alarm Response

Scheduled checks on gates, fencing, fuel and the material store, and an officer attending an alarm at any hour.

An ACS fixed camera mounted on an industrial wall Site office and compound

Commercial CCTV

Fixed cameras on the trailer, the compound and the stores, recording in colour at night with footage you can hand to an insurer.

Most builds start with one of these and add the next as the site opens up. The walkthrough decides the order — see what an assessment covers

The equipment

What goes up, and when it moves.

A build needs equipment that arrives before the power does and gets repositioned as the footprint changes — not a system commissioned once and left pointing at last month’s compound.

  • ACS cameras and a speaker mounted on the corner of a site office trailer
    Cameras on the site office Trailer corner, gate and compound

    Where there is already a trailer, the cameras and the speaker go straight onto it — covering the gate, the compound and the door everyone signs in at, with no separate structure to place.

Not sure what your site needs at this phase? Ask an operator who watches builds like yours.

(519) 800-3947
Proof

Layered on a
live construction site.

A building under construction at night, the tower crane lit above it
Construction · Layered program

Active construction site

Problem: an active build with exposure that shifted phase by phase.

Plan: guards on the gate, a mobile defense tower on the perimeter, live virtual oversight after hours.

Outcome: continuity across every phase, and one record of site activity.

Read this case on the results page
FAQ

Common questions.

Yes. We assess the site as it is now, current phase, current exposure, and deploy the layers that fit.

The assessment decides. Many sites run a hybrid: gate guard by day, tower and virtual oversight overnight.

Patrol rounds, tower deterrence and live operators on the feeds, with documented escalation when activity turns into risk.

A daily report with photos, timestamps and gate activity, plus incident reports whenever something happens.

They're planned as the highest-exposure windows, coverage is scheduled before the long weekend, not after it.

Sometimes. A tower with live oversight can hold a perimeter alone; the assessment tells us when a hybrid serves the site better.

Question not covered here? Call (519) 800-3947 and talk to the team that runs the coverage.

Let's secure
your site.

  1. Tell us about the siteSend the short form, or call (519) 800-3947.
  2. A coordinator follows upBy phone or email, to book your walkthrough.
  3. Your free assessmentLayout, access points, high-risk hours and the coverage that fits.